Work: The vessel has been inerted with 20 tons of nitrogen upon arrival, allowing gas free certification and safe repair operations. Standard dry-docking works have been performed and Intermediate renewal Class Survey has been passed successfully. Inert gas generator, cargo system Freon unit and AC accommodation unit have been completely overhauled. The Cargo system has been overhauled, including replacement of cargo pipelines and Framo pumps repair, followed by a successful NDT control and a pressure tests of the whole system at 18 bars.
The vessel has been gassed up with 20 tons of LPG mix before departure and safely headed to her new tasks.
We wish her and her crew good luck and bon voyage!