Tag: shipbuilding
Keel laying of 1,840 m3 Trailing Suction Hopper Dredger
On 22nd of April 2015 the Keel laying event for the 1,840 m3 TSHD took place at MTG Dolphin Shipyard. The ship is being built under building number BN802 by order of Royal IHC for Dutch Dredging and will be delivered in late autumn of 2015. She is a standardized...
Successful launching of Easydredge® 2700
The first Easydredge® 2700, built for and by order of Royal IHC has been successfully launched at MTG Dolphin Shipyard on 16th December 2014. The new vessel will be supplied with a “world-dredging package”, which includes bottom doors, a bow coupling and a dredging depth of 25m. This makes her...
Cutting of the first steel plate for 1’840 m3 Trailing Suction Hopper Dredger
Cutting of the first steel plate for the new project - 1’840 m3 Twin Screw Trailing Suction Hopper Dredger „Mahury” will take place at MTG Dolphin on 25th of November 2014. This is the second ship in series (after “Albatros”), being built by order of Royal IHC for Dutch Dredging....
Keel laying of 2,700 m3 Trailing Suction Hopper Dredger “Easydredge 2700”
On 18th of August 2014 the Keel laying event for the IHC Easydredge 2700 ™ took place at MTG Dolphin Shipyard. The ship is being built under building number BN1001 by order of Royal IHC and will be delivered in the summer of 2015. She is a standardized twin screw...
Name giving ceremony of BN 901/ “ITALENI”
On 18/6/2014 at MTG Dolphin Shipyard took place the Name giving ceremony of "ITALENI". The vessel is self-propelled 750 cubic meters Grab Hopper Dredger, built by order of IHC Global Production for Transnet National Ports Authority of South Africa. Length (OA): 62 m Length (BP): 59 m Width: 15 m Depth: 4.5 m Hopper volume: 750 m³ The vessel, as Mrs....
Successful delivery of m/v “Albatros”
MTG Dolphin successfully delivered 1500 m3 hopper dredger “Albatros” to her Owners. After successful sea and dredging trials suction hopper dredger “Albatros” has been delivered to her Owners on 11th December 2013. The vessel was built at the MTG Dolphin Shipyard. Length: 75 m Breadth: 13,40 m Draught: 3.50 m...
Cutting of the first steel plate for 2’300 m3 Suction Hopper Dredger
Cutting of the first steel plate for the new project of MTG Dolphin – 2’300 m3 Trailing Suction Hopper Dredger took place at the Yard on 25th of March 2014. She is a standardized twin screw trailing suction hopper dredger with a hopper capacity of 2’700m3. Capable of dredging with...