June 2016, Floating dock No 1 of MTG- Dolphin” Shipyard Repair of Ro-Ro vessel ,,Maestro Sea’’
A wide range of services have been carried out during the dry dock period of the vessel. Except for the standard dry dock services such as underwater maintenance and survey, measurements on the propeller and rudder systems, grit blasting and painting , number of additional maintenance services were performed: Hydro...
Delivery of the hull for “1350 kW Cutter Suction Dredger”
“MTG DOLPHIN” Shipyard successfully delivered the hull for “1350 kW Cutter Suction Dredger”, ordered by “IHC Holland” BV, the Netherlands Cutter power 170 kW Dredging depth 14 m Diameter of suction pipe 550 m
MTG Dolphin made official its agreements for cooperation with Thales (Netherlands), Leonardo/Finmeccanica (Italy) and Diehl Defence (Germany) during the second day of HEMUS 2016
This natural continuation of the cooperation between the companies provides an opportunity for deployment of most modern combat systems on board of designed and built in Bulgaria naval combat ships.
MTG Dolphin at Hemus 2016
Minister Nenchev visiting our stand during the opening tour.
Cutting of the first steel plate of the new Hydrographic vessel for the Executive Agency for exploration and maintenance of the Danube river”
Cutting of the first steel plate for the new project - Catamaran for hydrographic surveys took place at MTG Dolphin on 19th of May 2016. The hydrographic surveying vessel will work in the Bulgarian – Romanian part of the Danube river. The Shipowner is the Executive Agency for exploration and...
Cutting of the first steel plate of the new Hydrographic vessel for the Executive Agency for exploration and maintenance of the Danube river”
Cutting of the first steel plate for the new project - Catamaran for hydrographic surveys took place at MTG Dolphin on 19th of May 2016. The hydrographic surveying vessel will work in the Bulgarian – Romanian part of the Danube river. The Shipowner is the Executive Agency for exploration and...
Cutting of the first steel plate for 3‘500 m3 Trailing Suction Hopper Dredger
Cutting of the first steel plate for the new project -  3‘500 m3 Trailing Suction Hopper Dredger „Minerva” took place at MTG Dolphin on 4th of February 2016.  The sections for the ship will be built again in cooperation with the Dutch Royal IHC company, and the Client is Belgian...