Name giving ceremony of 2’300m3 TSHD „LESSE“
On the 23rd of May 2019, the third consecutive trailing hopper dredger, building No.803/CO1295, for Dutch Dredging received her name “Lesse” at an official ceremony in MTG Dolphin Shipyard, Varna. The vessel is an improved version of the previously built “Albatros” and “Mahury” and is designed to maintain sea and...
KEEL LAYING OF BN 803
Keel laying for 2'300 m3 Trailing Suction Hopper Dredger took place at MTG Dolphin on 21st of December 2017. This is the third project, built in cooperation and by order of Royal IHC for Baggerbedrijf de Boer - Dutch Dredging. The delivery of the vessel is expected in January 2019.
CUTTING OF THE FIRST STEEL PLATE OF BN 803
Cutting of the first steel plate for the new project – 2’300 m3 Trailing Suction Hopper Dredger for Baggerbedrijf de Boer – Dutch Dredging took place at MTG Dolphin on 19th of October 2017. This is the third project, built in cooperation and by order of Royal IHC  for Dutch...
Delivery of the hull for “1350 kW Cutter Suction Dredger”
“MTG DOLPHIN” Shipyard successfully delivered the hull for “1350 kW Cutter Suction Dredger”, ordered by “IHC Holland” BV, the Netherlands Cutter power 170 kW Dredging depth 14 m Diameter of suction pipe 550 m
Cutting of the first steel plate for 3‘500 m3 Trailing Suction Hopper Dredger
Cutting of the first steel plate for the new project -  3‘500 m3 Trailing Suction Hopper Dredger „Minerva” took place at MTG Dolphin on 4th of February 2016.  The sections for the ship will be built again in cooperation with the Dutch Royal IHC company, and the Client is Belgian...
Fourth dredger TSHD “Mahury” was named after official ceremony at MTG Dolphin Shipyard on 29th of October
A short official ceremony took place at MTG Dolphin Shipyard on 29th October for the Name giving of 1’840m2 TSHD “Mahury”.  The ship is designed to maintain waterways, sea and inland waterways, as well as to participate in land reclamation. Dredging depth bellow waterline is 30 meters and the hopper...
Keel laying of 1,840 m3 Trailing Suction Hopper Dredger 
On 22nd of April 2015 the Keel laying event for the 1,840 m3 TSHD took place at MTG Dolphin Shipyard. The ship is being built under building number BN802 by order of Royal IHC for Dutch Dredging and will be delivered in late autumn of 2015. She is a standardized...
Successful launching of Easydredge® 2700
The first Easydredge® 2700, built for and by order of Royal IHC has been successfully launched at MTG Dolphin Shipyard on 16th December 2014. The new vessel will be supplied with a “world-dredging package”, which includes bottom doors, a bow coupling and a dredging depth of 25m. This makes her...