Tag: varna
T/B “CASTOR” at her namegiving ceremony
https://youtu.be/7jghv7Nqp0g
MTG-DOLPHIN DELIVERS “CASTOR”
MTG-Dolphin delivered today the third tug of a series of five vessels to Navigation Maritime Bulgare (Navibulgar). At a christening ceremony held at the Port of Varna the ship received the name "CASTOR". Like the previous two tugs in the series, it was built to the Robert Allan Ltd RAmparts...
Sea trials of BN 1203, Marking vessel
https://youtu.be/HoSBRaUPhn8
SECOND-IN-SERIES TUG RECEIVES THE NAME “ALIOTH”
Last week MTG-Dolphin delivered a second-in-series tug, named “ALIOTH”, to Navigation Maritime Bulgare (Navibulgar). The ship naming ceremony was held at the Port of Varna on the 29th of June. This is the second of three vessels in a series built to the Robert Allan Ltd RAmparts 2700 design. “ALIOTH”...
CUTTING OF THE FIRST STEEL PLATE OF BN 1404 – THE FOURTH TUGBOAT OF THE 40 TBP SERIES
Cutting of the first steel plate for the new project took place at MTG Dolphin on 10th of May 2018. The ship is the fourth azimuth stern drive tugboat in construction for Navigation Maritime Bulgare plc. under the supervision of Bureau Veritas and will sail under Bulgarian flag. ...
KEEL LAYING OF BN 1403
Keel laying of 40 t. bollard pull ASD Tug boat took place at MTG Dolphin on 19th of April 2018. This is the third vessel in row, being built for Navigation Maritime Bulgare.
CUTTING OF THE FIRST STEEL PLATE OF BN 1403 – THE THIRD TUGBOAT OF THE 40 TBP SERIES
Cutting of the first steel plate for the new project took place at MTG Dolphin on 26th of January 2018. The ship is the third azimuth stern drive tugboat in construction for Navigation Maritime Bulgare plc. under the supervision of Bureau Veritas and will sail under Bulgarian flag. ...
CUTTING OF THE FIRST STEEL PLATE OF BN 1203 – NEW MARKING VESSEL FOR THE EXECUTIVE AGENCY FOR EXPLORATION AND MAINTENANCE OF THE DANUBE RIVER
Cutting of the first steel plate for the new project – Marking vessel took place at MTG Dolphin on 2nd of November 2017. The Shipowner is the Executive Agency for exploration and maintenance of the Danube river and the vessel will be built under the FAIRway Danube project for maintaining...
KEEL LAYING OF BN 1701
Keel laying of the 1’500 DWT Oil Product Tanker for Rubis Eastern Caribbean srl. took place at MTG Dolphin on 24th of October 2017. Тhe delivery of the vessel is expected in May 2018.
CUTTING OF THE FIRST STEEL PLATE OF BN 803
Cutting of the first steel plate for the new project – 2’300 m3 Trailing Suction Hopper Dredger for Baggerbedrijf de Boer – Dutch Dredging took place at MTG Dolphin on 19th of October 2017. This is the third project, built in cooperation and by order of Royal IHC for Dutch...